Quality Assurance Surveys Completions Damages/Claims Centralized Dispatch Weekly Ops Calls
     
 

Quality Assurance Surveys

  • We inspect between 10-20% of all completed jobs.
  • All inspections are reported on QAS forms, with photos.
  • All forms are compiled on to a company server to be available for observation by the Project Manager/ QAS Manager/ VP/ and CEO.
  • Failed inspections that require 20 minutes or less of repair are fixed by the inspector.
  • Anything requiring more than 20 minutes, or drilling, is scheduled internally with the customer for repair.
  • Technicians receive the failed QAS forms the following day to correct behavior immediately.
  • Inspections are compiled to a report detailing each technician’s performance each Monday. 
  • The report is submitted to all technicians weekly for an overall, positive and negative, feedback on performance and any assessed penalties.

 

 

 

 

   
 

 

 

 
 
  © Copyright 2006 Aerocomm, Inc. All Rights Reserved. Design by IST